Back to the task

In the print window, choose 'Save as PDF' as the destination.

Desher Kaj

Pothole report

In Gazipur’s industrial belt, heavy vehicles break the roads fast.

Roads & road safety

Area

Gazipur

People

4 people

Time

About 5 hours

Difficulty

Easy

About this task

In Gazipur’s industrial belt, heavy vehicles break the roads fast. Dividing an area’s roads, listing each pothole and broken stretch with a photo, map location, rough size and risk; then handing it to the municipality or upazila engineer’s office, and a month later checking how many were mended.

Why it matters

Potholes overturn rickshaws, throw motorbikes and hold up ambulances. A precise list in the authority’s hands makes it easy to decide what to mend first.

What changes after

At least twenty potholes listed with photo and location; the authority’s received copy; an update a month later.

Who can join

Anyone with a smartphone.

Step by step

  1. 1

    Divide the roads30 min

    Each takes a few roads.

    Done
  2. 2

    Photo and location180 min

    A photo, map pin, rough size and how dangerous, for each.

    Done
  3. 3

    Hand in and follow up90 min

    A received copy; a month later, check how many were mended.

    Done

When it counts as done

  • At least twenty potholes listed with photo and location
  • The authority’s received copy

Proof required: Document, Photo

⚠ Safety

Photograph from the pavement; never stand in the middle of the road.

What it costs

Printing the list (with colour photos) and copies3 sets৳100–300
Mobile data (maps and sending photos)4 people৳50–100
File cover and envelope1 set৳30–60
Total (about)৳500–1,400

Getting ready, step by step

  • 7 days before

    Fix the area's edges; split its roads into four parts on a map.

    Find out which roads belong to the municipality, LGED or the roads department.

  • The day before

    Make a shared sheet: number, road name, map link, rough size, risk (low/medium/high), photo number.

    Check everyone's phone has location on and the camera shows the date.

  • On the day

    Each walks their part: a far and a near photo, map pin and size for each pothole.

    At midday merge everything in one sheet; check for duplicates.

  • 2–3 days after

    Print the list and hand it in with the application; get a stamp and date on the received copy.

    Put a photo of the received copy in the proof.

  • A month later

    Go back to the same spots and see how many were mended; take new photos.

    Return to the office with the update, or raise it through 333.

Who does what

  • Lead (1): Splits the area, keeps the sheet, hands in and follows up. — ____________
  • Surveyors (2): Photo, pin, size and risk for each pothole in their part. — ____________
  • Sheet and checking (1): Surveys a part too, and enters everyone's data in the sheet, removes duplicates, matches photo numbers. — ____________

The day, hour by hour

  • 07:30Gather, split parts, safety talk: photos only from the pavement or road edge.
  • 08:00Survey starts in each part.
  • 10:00Water break in shade; enter the first round in the sheet.
  • 10:15Survey the rest.
  • 11:30Meet up; merge the sheet, remove duplicates.
  • 12:00Mark the five most dangerous at the top of the list.
  • 12:30Done; fix the day to print and hand in.

What can go wrong, and what to do

  • Being hit by traffic while photographing → Never stand mid-road; shoot from the pavement or edge, zoom if needed; on busy roads go in pairs, one watching traffic.
  • The office refuses the list or a received copy → Ask politely again; otherwise send by post and keep the receipt, or raise it via 333.
  • Injury falling into a water-filled pothole → Never test a flooded pothole's depth with your foot; use a stick or estimate.

Useful numbers

  • 999National emergency: police, fire, ambulance (free)
  • 333Government information, services and complaints

Questions people ask

Which office gets it?
Town roads to the municipality; village roads usually to the upazila engineer (LGED).
Can I join if I cannot stay the whole time?
Yes. Say in your request which step or which hours you can do. The lead will give that step to you.

Team notes