Cleaning and painting a school’s walls

With the school’s written permission, on a holiday, a school’s walls scraped, washed and newly painted; if the teachers wish, the alphabet or a map, but never a slogan or an advert.

0/8 people
About 12 hours
25
points

About this task

With the written permission of the head teacher and managing committee, on a holiday, peeling paint and moss scraped off a school’s walls, washed and dried, then two coats of water-based paint. If the school wishes, the alphabet, numbers or a map, as the teachers choose. No slogan, party name, portrait or advert. Finally a clean-up and a handover signed by the head teacher.

Why it matters

Many schools’ walls have gone unpainted for years; moss and flaking plaster make them look dreary. A clean, bright school becomes a happy place for children, and when local people do it with their own hands they feel the school is theirs.

What changes after

The chosen walls clean and newly painted, in before and after photos; a handover signed by the head teacher; leftover paint left with the school.

Who can join

Anyone; only adults up high or on ladders. Best with someone experienced in painting or murals.

Step by step

0 of 4 steps done

How to do it, in order.About 12 hours across all steps

  1. 1

    Written permission and the colours

    Written permission from the head teacher and managing committee; agree together which walls, which colours, what to draw.

    120 min

    Not startedIn hand:Nobody yet
  2. 2

    Scrape and wash

    Scrape off peeling paint and moss, wash with water and let dry; cover floors and windows.

    240 minশিরিশ কাগজ ও স্ক্র্যাপার, পলিথিনের ঢাকনা

    Not startedIn hand:Nobody yet
  3. 3

    Paint

    Water-based paint, two coats; only adults up high, with someone holding the ladder.

    300 minরং, ব্রাশ ও রোলার, মই

    Not startedIn hand:Nobody yet
  4. 4

    Clean up and hand over

    Clear away paint tins, covers and rubbish; a handover note signed by the head teacher.

    60 min

    Not startedIn hand:Nobody yet

What you need

  • Water-based paint · দেয়ালের মাপ অনুযায়ী
  • Brushes and rollers · ৮ সেট
  • Ladders · ২টি

When it counts as done

  • Before and after photos of the same walls from the same angle
  • A handover note signed by the head teacher

Proof required

  • Before photo
  • After photo
  • Document

Safety

Keep students away while scraping and painting; keep windows open. No paint near electric wires or switches. Never climb a ladder without someone holding it.

The full guide

What it takes, and how to do it

Never done this before? No matter. The cost, the timeline, who does what, whom to speak to, the day hour by hour, the risks and ready words to send are all here.

About
৳8,000–20,000
People
8
Time in all
12 hours
Age
14 or older

Best timeThe dry season, November to March, when paint dries well. On school holidays.

PermissionWritten permission from the head teacher and managing committee, with which walls, which colours and what will be drawn in writing.

What it costs

Prices differ by district and season; this is a 2026 estimate. Keep receipts and put them in the proof.

WhatPrice
Water-based paintAs the walls need, about 20 litresWhere: Paint shop৳250–500
Brushes and rollers8 setsWhere: Paint or hardware shop৳200–400
Sandpaper and scrapers8 setsWhere: Hardware shop৳80–150
Plastic sheeting and masking tape1 setWhere: Hardware shop৳300–600
Drinking water and a light snack8 peopleWhere: Neighbourhood grocery৳60–100
Total (about)৳8,000–20,000

Getting ready, step by step

  1. 14 days before

    • Written permission; measure the walls and work out the paint.
  2. 7 days before

    • Buy or receive paint and tools in kind; keep receipts.
    • Borrow at least two ladders.
  3. Day one

    • Before photos; scrape, wash, leave to dry.
  4. Day two

    • Two coats of paint; clean up; after photos; handover.

Who does what

  • Lead1

    Liaises with the school, holds the permission, does the handover.

  • Scraping and painting team5

    Low walls; only adults on the high parts.

  • Ladders and safety1

    Hold each ladder at the foot; keep everyone away from wires and switches.

  • Photos and records1

    Photos with consent, lists, receipts, handing in the proof.

Whom to speak to first

  • The head teacher and managing committee

    Why
    The school is theirs; so is the choice of colours and drawings.
    How
    Meet them with colour samples; get the decision in writing.
  • The art teacher

    Why
    If the alphabet or a map is drawn, the design is theirs.
    How
    Draw the design on paper first.

The day, hour by hour

  1. 08:00Gather, safety talk, cover floors and windows.
  2. 08:30Before photos; scrape off paint and moss.
  3. 11:00Wash with water and leave to dry.
  4. 14:00(Next day) first coat.
  5. 16:00Second coat, clean up, after photos, handover.

How to take the proof

  • Before and after photos of each wall from the same angle.
  • A photo of the handover note signed by the head teacher.
  • Paint receipts on one page.

Common first-time mistakes

  • Painting a damp wall.
  • Working without covering floors and windows.
  • Leaving leftover paint and rubbish behind.

What can go wrong, and what to do

  • A fall from a ladder

    Someone always holds the ladder; no ladder on a wet floor; call 999 for an injury.

  • Electric shock

    No paint or water near wires and switches; if needed, ask the school to switch off the main.

  • Someone wanting a slogan or name on the wall

    Say no; only what the permission letter says.

Ready words to send

Copy, fill the [brackets], send.

WhatsApp / Facebook invitation

Help give a school’s walls a new life! Where: [school name], [area] When: [date] and [date], from 8 am What: scraping and washing the walls, two coats of paint. Bring: old clothes, a cap. Age 14 and up; only adults on ladders. To join: send a join request on this task’s page on Desher Kaj, or tell [lead’s name] in this group.

Letter to the head teacher asking permission

Date: [date] To The Head Teacher [school name] Subject: Permission to clean and paint the school’s walls. Sir/Madam, On [date] and [date], school holidays, we wish to scrape and wash the school’s [which] walls and paint them in [colour] water-based paint. As you and the managing committee prefer, we will draw [the alphabet / a map / nothing]. No name, slogan or advert will be written. No money will be collected from anyone for this work; what is needed comes as gifts in kind or at the team’s own cost. We would be grateful for your permission. Yours faithfully [Name], team lead [team name], a volunteer team on the Desher Kaj platform Phone: [number]

After it is done

  • Leave leftover paint with the school for touch-ups.
  • After six months, post photos from the same spots.

Questions people ask

Can we write our team’s or organisation’s name on the wall?

No. No names, slogans or adverts on a school wall; your names are on the task page.

Can students paint?

On low walls, supervised by a teacher, in the drawing part after the base coat dries; never scraping or ladder work.

Can I join if I cannot stay the whole time?

Yes. Say in your request which step or which hours you can do. The lead will give that step to you.

Map

Apart from sign-in, language and the admin sidebar, the only cookies are Google Analytics', which count which pages are read and where readers come from. No ads, and we never sell your information. More